Port Stalashen Wastewater Treatment Plant

Sechelt, British Columbia
This project involves the construction of a new wastewater treatment plant for the 800-person Sechelt Indian Government District community on the Sunshine coast region of BC. The new plant includes earthworks, yard piping, an upflow sludge blanket filter (USBF) treatment system complete with several underground concrete tanks, an odour control system, a new greenhouse, and corresponding electrical and instrumentation works. In addition, the plant is designed to achieve a 10/10 provincial discharge standard exceeding the federal standards for a surface water discharge using a tertiary treatment system and UV disinfection. A centrifuge system is designed to dewater sludge on site to minimize trucking costs for offsite disposal of solids.
Project also includes the removal and disposal of the existing rotating biological contactor (RBC) wastewater treatment unit.
Additional Scope Items
  • 200 mm diameter gravity sewer main.
  • 200 mm diameter watermain.
  • 100 mm sanitary forcemains.
  • Removal and disposal of existing wastewater treatment units.
  • Upflow sludge blanket filter (USBF) wastewater treatment plant supply and install.
  • Odour control system.
  • Greenhouse supply and install for enclosing equipment and screening rooms.
  • Site earthworks including excavation, embankment fill, access road and parking, restoration, landscaping.
  • Electrical works, including generator supply and install.
  • Optional works: supply and install of greenhouse over bioreactors, paved parking area, landscaping, and concrete logo.

Port Stalashen Wastewater Treatment Plant

Sechelt, British Columbia
This project involves the construction of a new wastewater treatment plant for the 800-person Sechelt Indian Government District community on the Sunshine coast region of BC. The new plant includes earthworks, yard piping, an upflow sludge blanket filter (USBF) treatment system complete with several underground concrete tanks, an odour control system, a new greenhouse, and corresponding electrical and instrumentation works. In addition, the plant is designed to achieve a 10/10 provincial discharge standard exceeding the federal standards for a surface water discharge using a tertiary treatment system and UV disinfection. A centrifuge system is designed to dewater sludge on site to minimize trucking costs for offsite disposal of solids.
Project also includes the removal and disposal of the existing rotating biological contactor (RBC) wastewater treatment unit.
Additional Scope Items
  • 200 mm diameter gravity sewer main.
  • 200 mm diameter watermain.
  • 100 mm sanitary forcemains.
  • Removal and disposal of existing wastewater treatment units.
  • Upflow sludge blanket filter (USBF) wastewater treatment plant supply and install.
  • Odour control system.
  • Greenhouse supply and install for enclosing equipment and screening rooms.
  • Site earthworks including excavation, embankment fill, access road and parking, restoration, landscaping.
  • Electrical works, including generator supply and install.
  • Optional works: supply and install of greenhouse over bioreactors, paved parking area, landscaping, and concrete logo.

More to come ….