Additional Scope Items

  • Temporary dissolved air flotation (DAF) bypass for flows of 10 m3/hr (44 usgpm)
  • Construction of below grade lift station.
  • Construction of addition to wastewater treatment facility building.
  • Refurbishment of existing facility.
  • Furnish and installation of equipment, tanks, chemical addition systems, pumps, power, and controls.
  • Installation of double-containment piping with leak detection.
Project DetailS

Building the Future with Expertise & Innovation

Expansion and renovation of an existing wastewater treatment facility including the demolition of the existing facility equipment, construction of a new pre-engineered building, and the supply and installation of new equipment. Also included track crossing in 3 locations with buried piping and concrete.

Challenges
  • Significant delay of a major piece of equipment due to manufacturer.
  • Majority of work had to be completed during the coldest part of the year in Saskatchewan.