Townsend Creek Culvert Drainage Improvements
Fort St. John, British Columbia
This in-stream project involved the sliplining of an existing 6-foot diameter culvert pipe, repairs to two existing culverts and the boring and installation of 150 feet of welded 10-foot diameter steel pipe under the Alaska Highway at the Townsend Creek crossing halfway between Fort St. John and Fort Nelson, BC near Pink Mountain.
Additional Scope Items
- In-stream construction.
- Environmental management and monitoring.
- Significant excavation, dewatering, welding and armoring of headwalls.
- Traffic management planning and execution.
- Culvert slip lining.
- Steel culvert jacking.
- Concrete encasement work.
Townsend Creek Culvert Drainage Improvements
Fort St. John, British Columbia
This in-stream project involved the sliplining of an existing 6-foot diameter culvert pipe, repairs to two existing culverts and the boring and installation of 150 feet of welded 10-foot diameter steel pipe under the Alaska Highway at the Townsend Creek crossing halfway between Fort St. John and Fort Nelson, BC near Pink Mountain.
Additional Scope Items
- In-stream construction.
- Environmental management and monitoring.
- Significant excavation, dewatering, welding and armoring of headwalls.
- Traffic management planning and execution.
- Culvert slip lining.
- Steel culvert jacking.
- Concrete encasement work.