Significant excavation, dewatering, welding and armoring of headwalls.
Traffic management planning and execution.
Culvert slip lining.
Steel culvert jacking.
Concrete encasement work.
Project DetailS
Building the Future with Expertise & Innovation
This in-stream project involved the sliplining of an existing 6-foot diameter culvert pipe, repairs to two existing culverts and the boring and installation of 150 feet of welded 10-foot diameter steel pipe under the Alaska Highway at the Townsend Creek crossing halfway between Fort St. John and Fort Nelson, BC near Pink Mountain.