Power Plant Dismantle
Medicine Hat, AB
Mitsubishi Europe (London) contracted Industra to dismantle the Unit 8 power plant in Medicine Hat, Alberta. The 130-foot-tall exhaust stack was removed, along with the economizer, boiler, turbine and generator. Significant piping modifications and repairs were required. The turbine and generator, each weighing approximately 550,000 lbs, were loaded onto heavy haul transport rigs and then offloaded onto railcars. Both units were transported to Houston, TX and delivered to Mitsubishi’s turbine re-build facility.
Additional Scope Items
- Dismantle of 130 ft. simple cycle stack.
- Dismantle of intake and exhaust plenums.
- Removal of all electrical components.
- Foundation demolition.
- Load & transport of 550,000# turbine.
- Load and transport of 550,000 lb generator.
- Logistics coordination Canada to USA.
- High Pressure Piping Repairs.
- CWB certified structural steel welding.
- Heavy rigging and hoisting.
- Work from heights
Power Plant Dismantle
Medicine Hat, AB
Mitsubishi Europe (London) contracted Industra to dismantle the Unit 8 power plant in Medicine Hat, Alberta. The 130-foot-tall exhaust stack was removed, along with the economizer, boiler, turbine and generator. Significant piping modifications and repairs were required. The turbine and generator, each weighing approximately 550,000 lbs, were loaded onto heavy haul transport rigs and then offloaded onto railcars. Both units were transported to Houston, TX and delivered to Mitsubishi’s turbine re-build facility.
Additional Scope Items
- Dismantle of 130 ft. simple cycle stack.
- Dismantle of intake and exhaust plenums.
- Removal of all electrical components.
- Foundation demolition.
- Load & transport of 550,000# turbine.
- Load and transport of 550,000 lb generator.
- Logistics coordination Canada to USA.
- High Pressure Piping Repairs.
- CWB certified structural steel welding.
- Heavy rigging and hoisting.
- Work from heights