This active project on the border between the cities of New Westminster and Richmond includes replacing the existing pump station with a new pump station with increased capacity to accommodate anticipated future drainage flows from a proposed townhouse development. The existing pump station built in 1979, which has reached the end of its service life and capacity, must remain in operation during construction.
Project also includes construction of concrete pads and installation of electrical kiosk and genset for lift station in eastern New Westminster.