Clearbrook Water Storage Reservoir Replacement

Abbotsford, British Columbia
This active project involves working with DN Tanks from California to design and construct a new 4.50 ML above-ground concrete reservoir to store potable water in the Abbotsford, BC community of Clearbrook.
Additional Scope Items
  • Site works including ground improvements for structural foundations, excavating, backfilling, grading, drainage, fencing, site dewatering and landscaping.
  • Installation of process mechanical piping, valves, fittings and appurtenances for interconnection of the systems.
  • Installation of mechanical piping, valves, fittings and appurtenances to interconnect equipment and tie-into proposed works.
  • Electrical and instrumentation to service the new facilities.
Next Project

Clearbrook Water Storage Reservoir Replacement

Abbotsford, British Columbia
This active project involves working with DN Tanks from California to design and construct a new 4.50 ML above-ground concrete reservoir to store potable water in the Abbotsford, BC community of Clearbrook.
Additional Scope Items
  • Site works including ground improvements for structural foundations, excavating, backfilling, grading, drainage, fencing, site dewatering and landscaping.
  • Installation of process mechanical piping, valves, fittings and appurtenances for interconnection of the systems.
  • Installation of mechanical piping, valves, fittings and appurtenances to interconnect equipment and tie-into proposed works.
  • Electrical and instrumentation to service the new facilities.

Work continues …