The work includes upgrading of Gallagher Place and Kensington Crescent wastewater pump stations, complete with long term temporary bypass systems, prefabricated FRP/fiberglass pump and valve chambers with submersible wastewater pumps, valves and piping, connection manholes, new electrical room, electrical, instrumentation and communication control systems, 600V power supply with standby power facilities.