Additional Scope Items

Owner: Surrey, BC

Consulting Engineer: Keer Wood Leidal Associates Ltd (KWL)

Project DetailS

Building the Future with Expertise & Innovation

Upgrades to the Whalley Pump Station and replacement of generator equipment at the Newton Pump Station, including installation of new pumping equipment, process piping, HVAC systems, and advanced electrical systems such as active harmonic filters.
The work also included upgrades to electrical distribution, control systems, and civil utilities, including watermain installations and hot-tap connections. Execution was carried out within active pump station environments, requiring staged implementation, system isolation, and continuous operation throughout construction.