Restoration of the primary, secondary and tertiary border inspection structural canopy areas. Included high pressure sandblast surface preparation of the recoated steel. An engineered tube and clamp scaffold system was installed as the hoarding superstructure with a shrink wrap enclosure. An ambient temperature of 10 degrees was attained with a heating system through the winter months. Significant traffic control and lane closures were required to accommodate access for work and provide full border protection at this busy border crossing.