Upgrade of the existing Fittons Road West Sewage Pumping Station including replacement of all process, mechanical, and electrical equipment, installation of new dry-pit submersible sewage pumps within the existing dry well, and upgrades to ventilation, gas detection, and electrical systems to meet NFPA 820 and Ontario Electrical Safety Code requirements.
The work also includes structural modifications, installation of new access hatches, overhead lifting systems, outdoor generator and fuel systems, and integration of upgraded process and control systems within an existing operational facility.