Project to decommission and dispose of the existing rotating biological contactor (RBC) plant in the 94-home Kelvin Grove neighbourhood of Lions Bay, BC. Design, supply, install, and commission a new prepackaged secondary treatment system consisting of an RBC plant and secondary clarifier that fit within the confines of the existing concrete well. For the duration of the decommissioning and disposal of the existing RBC, a secondary, rental, treatment system was installed that met the Municipality’s existing effluent quality requirements. In addition, given the proximity to homes and the steep terrain, noise bylaw adherence and sediment protection plans were implemented.