Wastewater treatment plant upgrades at Atlantic Institution, Renous, including construction of new lagoon cells, SAGR chambers, utilities, and a new process/control building, along with aeration, UV disinfection, and alum dosing systems. The work also included decommissioning and capping of existing lagoons and control buildings.
The project combined large-scale civil excavation, liner installation, concrete, masonry, roofing, and full process mechanical and electrical systems on a geotechnically variable site, all executed under continuous operation of the existing treatment facilities.