Concrete and foundation upgrade works at Svante’s Glenlyon Parkway facility, including tilt-up wall pilaster and beam construction, as well as selective demolition and foundation upgrades within an active industrial environment.
The project involved forming, placing, and finishing of new structural concrete elements, including pilasters, beams, and slab upgrades, along with integration of new concrete works into existing structures through dowel tie-ins and epoxy anchoring systems.
Additional scope included selective demolition, slab removals, hydrovac and bulk excavation, and backfill/compaction works, requiring careful coordination between interior and exterior work areas.
Execution was carried out within an operational facility with strict access constraints and owner-imposed work stoppage windows, requiring detailed sequencing, protection of existing conditions, and continuous coordination to maintain ongoing operations.